产品
Miron Construction Co., Inc.
美国
    Coldwater Public Utilities - CHP Peaking Plant

    10273

    101

    152

    联系供应商
    收藏 点赞

    描述

    目录

    视频

    Owner: Coldwater Board of Public Utilities, Michigan South Central Power Agency
    Completion: August 2015
    Architect / Engineer: Baisch Engineering, Inc.

    Project Description:
    This project consisted of the construction of a natural gas powered CHP peaking facility utilizing reciprocal engine/generator technology. Project scope included:

    Greenfield site construction
    Installation of (3) 624 GE engine/generator sets
    All site work and tie-in to existing power and water services
    Site development/earthwork
    Engine/office building
    CodiNOX modules
    14 MW engine generator capacity
    All above- and below-grade mechanical piping and ancillary equipment
    All electrical, control, and instrumentation
    其他
    Log in
    New to GM industry Sign up
    By signing up,you agree to our terms of use, privacy policy,and cookie policy
    have an account? Log in